Loading

Analysis of Blast Induced Ground Vibration under Varying Controlled Blasting Parameter
Abhishek Kumar Tripathi1, Gadhi Durga Nookaraju2, K. S. Siva Subramanian3

1Abhishek Kumar Tripathi*, Mining Engineering, Aditya Engineering College, Surampaelm, Kakinda, Andhra Pradesh, India.
2Gadhi Durga Nookaraju, Mining Engineering, Aditya Engineering College, Surampaelm, Kakinda, Andhra Pradesh, India.
3K.S. Siva Subramanian, Mining Engineering, AMET University, Chennai, India.
Manuscript received on March 12, 2020. | Revised Manuscript received on March 25, 2020. | Manuscript published on March 30, 2020. | PP: 3171-3175 | Volume-8 Issue-6, March 2020. | Retrieval Number: F8933038620/2020©BEIESP | DOI: 10.35940/ijrte.F8933.038620

Open Access | Ethics and Policies | Cite | Mendeley
© The Authors. Blue Eyes Intelligence Engineering and Sciences Publication (BEIESP). This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/)

Abstract: Mining activity plays a major role for economic development of any nation. The drilling and blasting are the two key operations in the mining industry. The execution of these operations generates some disturbances to the environment, like noise and vibration. Blasting is the process of reducing large rock mass into the smaller fragments for our convinces of further processing. In this study the blast induced vibrations are monitored in the form of peak particle velocity (PPV) for the different cases of varying hole spacing. In this study, the PPV was measured for the three different directions, namely, transitional, vertical and longitudinal and it was observed that the PPV for in transitional direction is decreasing with the increment in the hole spacing between two consecutive rows. Further, it was observed that peak vector sum (PVS) having an inverse relation with the hole spacing.
Keywords: Peak Particle Velocity, Hole Spacing, Blasting, Peak Vector Sum.
Scope of the Article: Predictive Analysis.