Grey Wolves Optimization for Economic Load Dispatch with Practical Constraints
Kalyan Sagar Kadali1, Rajaji Loganathan2

1Kalyan Sagar Kadali*, Research scholar, Department. of Electrical & Electronics Engineering, AMET University, Chennai-603112,India.
2Rajaji Loganathan, Professor, Department of Electrical & Electronics Engineering, ARM College of Engineering & Technology, Chennai-603209, India.

Manuscript received on 01 August 2019. | Revised Manuscript received on 06 August 2019. | Manuscript published on 30 September 2019. | PP: 4025-4029 | Volume-8 Issue-3 September 2019 | Retrieval Number: C5375098319/2019©BEIESP | DOI: 10.35940/ijrte.C5375.098319
Open Access | Ethics and Policies | Cite | Mendeley | Indexing and Abstracting
© The Authors. Blue Eyes Intelligence Engineering and Sciences Publication (BEIESP). This is an open access article under the CC-BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/)

Abstract: This paper manifests the applicability of grey wolf’s optimization (GWO) for solving economic load dispatch (ELD) problems by considering practical constraints of power generation, but effects of valve-point loading are not considered. This recommended technique is a evolutionary strategy of upgrade with fundamental structure and single control parameter to handle the complex mathematic as well as complicated engineering problems. It is a groundbreaking technique for adequately investigating the exploration and exploitation to locate the optimal solution within a low calculation time. The six generating tests-system have been utilized to exhibit the proficiency of GWO to solve ELD problem. The outcomes are contrasted with a several methods of optimization to confirm the elite of GWO for tackling the problem of ELD.
Keywords— Economic Load Dispatch (ELD), Grey Wolves Optimization (GWO), Valve-Point Loading.

Scope of the Article:
Construction Economics